SUPPLIER COMPARISON

FQC vs Sanmina — PCB-only fab vs integrated EMS + PCB supplier

Pick FQC if PCB is the technical risk in your program — high-layer-count HDI, automotive + medical dual cert, and direct dialogue with the actual fab. Pick Sanmina if you want PCB, assembly, box-build, and aftermarket consolidated under one PO with a single tier-1 EMS counterparty.

Side-by-side, by dimension
FQCSanmina
Business modelSpecialist PCB fabricatorTier-1 EMS — PCB + PCBA + box-build + aftermarket
Capability ceiling (HDI)5th-order any-layer up to 16 layers (production)Up to high-order HDI; varies by site, often outsources HDI to specialists
Layer count ceilingUp to 100 layers (42L award)High-layer-count via partner fabs + own backplane lines
CertificationsIATF 16949 + ISO 13485 + QC 080000 + ISO 9001/14001/45001AS9100 + ISO 13485 + IATF 16949 + ITAR (varies by facility)
GeographyThailand (parent in China)Global — 20+ countries; San Jose HQ
Pricing tierMid (PCB-only — no EMS markup)Bundled — PCB cost folded into EMS quote
Direct fab dialogueYes — talk to FQC engineers directlyNo — your interface is a program manager; PCB sub-fab is internal
Single-PO consolidation (PCB + PCBA + box)No — PCB only, separate EMS engagement neededYes — full vertical EMS stack
Customer typeOEMs and Tier-1s buying bare PCBOEMs outsourcing entire product manufacturing
Capacity / scale88,000 m² Thai PCB fab + parent campusPublicly-listed (NASDAQ: SANM); large global EMS
Years in operationThai site 2024-; parent since 1995Sanmina founded 1980, listed on NASDAQ
When to pick FQC
  • ·PCB is the high-risk node in your BOM and you need a specialist who lives and breathes laminate + microvia.
  • ·You already have a chosen EMS / contract manufacturer and want to consign the bare board.
  • ·Your program needs IATF 16949 + ISO 13485 in the same factory; you don't want EMS markup on the PCB layer.
  • ·You want direct DFM dialogue with the fab's engineers, not a managed escalation through a PM.
When to pick the competitor
  • ·You want PCB + PCBA + box-build + reverse logistics under a single tier-1 EMS counterparty.
  • ·Your program already runs on Sanmina-managed supply chain — adding a separate PCB fab adds counterparties.
  • ·Your buyer specifically requires US-publicly-traded prime EMS in the contract.

NEXT STEP

Want to walk through your specific board?

Walk through requirements 1-on-1 with our AI engineer, or request a quote directly.